Construction of 1,000,000 tons/year (500,000 tons/year x 2 lines) washing capacity concentrator facilities at Bigadic Boron Management Directorate (Bigadic/Balikesir)
CONSTRUCTION WORKS
- Earth Works,
- Concrete Works,
- Steel Works,
- Architectural Works
MECHANICAL WORKS
- Process Design
- Supply, Installation and Commissioning of Mechanical Equipment
- Optical Sorters,
- Crushers,
- Screens,
- Washing Drums,
- Pumps,
- Cranes,
- Conveyor Belts,
- Mechanical Pipes,
- Pipe Line (~8.500 mt)
ELECTRICAL AND AUTOMATION WORKS
- Supply and Infrastructure of OG Energy,
- Supply and Distribution of Strong Current Energy,
- Earthing Systems,
- DCS Control System,
- Instrumention Works,
- Fire Detection and Warning System,
- Interior and Exterior Lighting Systems,
- Emergency Lighting Systems,
- CCTV System,
- Energy Transmission Lines