Bigadiç Concentrator Facilities

Construction of 1,000,000 tons/year (500,000 tons/year x 2 lines)  washing capacity concentrator facilities at Bigadic Boron Management Directorate (Bigadic/Balikesir)

CONSTRUCTION WORKS

  • Earth Works,
  • Concrete Works,
  • Steel Works,
  • Architectural Works

MECHANICAL WORKS

  • Process Design
  • Supply, Installation and Commissioning of Mechanical Equipment
    • Optical Sorters,
    • Crushers,
    • Screens,
    • Washing Drums,
    • Pumps,
    • Cranes,
    • Conveyor Belts,
    • Mechanical Pipes,
    • Pipe Line  (~8.500 mt)

ELECTRICAL AND AUTOMATION WORKS

  • Supply and Infrastructure of OG Energy,
  • Supply and Distribution of Strong Current Energy,
  • Earthing Systems,
  • DCS Control System,
  • Instrumention Works,
  • Fire Detection and Warning System,
  • Interior and Exterior Lighting Systems,
  • Emergency Lighting Systems,
  • CCTV System,
  • Energy Transmission Lines
Eti Mine Works General Directorate
21.02.2018 - 10.05.2020