Breakwater and Berth Construction

*Removal of Existing Steel Piled Jetty, 5.100 m³
*Breakwater Construction with Offshore Rockfill, 32.000 m³
* Concrete works, 550 m³
* Dredging, 5.000 m³

Ark Construction
Tuzla / İSTANBUL
01.04.2010 - 01.09.2010