Completed Projects

Ankara İstanbul High Speed Rail Project, 2.Section, Prevention of Land Slips Between Tunnel 16-17

Installation of  Bored Piles, D: 165 cm, 6.048 m 252 pieces
* Capping Beams
* Drainage Channels
* Retaining Walls and Culverts
* Excavation-Filling , 2.000.000 m³
* Reinforced Concrete, 20.000 m³

TCDD (Turkish State Railways)
Vezirhan / BİLECİK
16.12.2013 - 25.05.2015