Completed Projects

Eren Energy Port Berth Construction

Construction of Berth No.3 (24m x 200m)
 * D: 1219 mm T: 18 mm, 6.250 m, 216 pieces of Steel Piles
 * Reinforced Concrete, 7.000 m³
Construction of Mooring Dolphins (8 m x 8 m), 2 Pcs
 * D: 1016 mm T: 16 mm, 400 m, 16 pieces of  Steel Piles
 * Reinforced Concrete, 300 m³
Construction Work of Tugboat Pier (16.5 m x 50 m)
 * D: 914,4 mm T: 14 mm, 600 m, 28 pieces of Steel Piles
 * Reinforced Concrete, 1000 m³
 * Concrete Pavement, 10.000 m²
 * Catwalk Production and Installation, 26 m, 2 pieces
 * Dredging, 65.000 m³
 * Categorical Stone Material, 35.000 m³

Eren Electricity Generation Corporation
Çatalağzı / ZONGULDAK
18.03.2015 - 16.12.2015