Construction of Filling Area and Coastal Protection :
* Breakwater Construction, 1,100 m
* Categorical Stone Material, 1.200.000 Tons
* Tetrapod Production and Installation, 65.000 m³
* Reinforced Concrete Wall, 20.000 m³
Construction of Filling Area and Coastal Protection :
* Breakwater Construction, 1,100 m
* Categorical Stone Material, 1.200.000 Tons
* Tetrapod Production and Installation, 65.000 m³
* Reinforced Concrete Wall, 20.000 m³